IRZ-HIP-Heidelberg
Heidelberg, Baden-Württemberg, Germany
Source: OpenStreetMap
IRZ-HIP-Heidelberg is an operating data center in Baden-Württemberg, Germany, operated by Data Center Group. DataCentersExposed has documented a 7,912 sq ft footprint at this site. It runs on Germany's grid, which was 41% fossil-fuelled at 330 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Overview
source: linkIRZ-HIP-Heidelberg is a mapped data center in Heidelberg, Germany, operated by Data Center Group. Available records put its footprint at 7,912 square feet. No ultimate parent or further ownership details are disclosed in the available records.
Operator chain
- Ultimate parentData Center Group
- Files asData Center Group
- This facilityIRZ-HIP-Heidelberg
The grid behind this site
source: Ember · EurostatA large data center in Germany pays 21.56¢/kWh for electricity — a household pays 39.43¢, 45% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Germany data centers.
In the news
source: Google News (local + English)- Nexspace erweitert den Standort Graz um ein RechenzentrumDataCenter-Insider· Aug 6, 2026
- Colocation: So wählt die Geschäftsführung das richtige Rechenzentrumdigitalbusiness-magazin.de· Jul 7, 2026
- Nexspace setzt auf regionale ExpansionDataCenter-Insider· Apr 23, 2026
- Nexspace kündigt mit Standort Stuttgart einen Wachstumskurs anDataCenter-Insider· Feb 5, 2026
- Der Branchenverband GDA lädt zum 3. „Tag der offenen Rechenzentren“ einDataCenter-Insider· Nov 4, 2025
- Künstliche Intelligenz steigert Effizienz im RechenzentrumDataCenter-Insider· Sep 18, 2025