IRZ-HIP-Heidelberg
Heidelberg, Baden-Württemberg, Germany
Source: OpenStreetMap
IRZ-HIP-Heidelberg is a mapped data center in Baden-Württemberg, Germany, operated by Data Center Group. DataCentersExposed has documented a 7,912 sq ft footprint at this site. It runs on Germany's grid, which was 41% fossil-fuelled at 330 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkIRZ-HIP-Heidelberg is a mapped data center in Heidelberg, Germany, operated by Data Center Group. Available records put its footprint at 7,912 square feet. No ultimate parent or further ownership details are disclosed in the available records.
Operator chain
- Ultimate parentData Center Group
- Files asData Center Group
- This facilityIRZ-HIP-Heidelberg
The grid behind this site
source: Ember · EurostatA large data center in Germany pays 21.56¢/kWh for electricity — a household pays 39.43¢, 45% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Germany data centers.
In the news
source: Google News (local + English)- Softbank will KI-Rechenzentren mithilfe von Robotern bauenDataCenter-Insider· May 18, 2026
- Nexspace setzt auf regionale ExpansionDataCenter-Insider· Apr 23, 2026
- Mehr Leistung, mehr Energie, mehr Umbau – KI verändert RechenzentrenDataCenter-Insider· Mar 5, 2026
- Nexspace kündigt mit Standort Stuttgart einen Wachstumskurs anDataCenter-Insider· Feb 5, 2026
- Nexspace Data Centers baut Co-Location-Datacenter in StuttgartDataCenter-Insider· Sep 16, 2025
- Tag der offenen RechenzentrenDataCenter-Insider· Oct 25, 2024