IP House London Datacentre
London, United Kingdom
Source: OpenStreetMap
IP House London Datacentre is an operating data center in United Kingdom, operated by IP House. DataCentersExposed has documented a 22,231 sq ft footprint at this site. It runs on United Kingdom's grid, which was 36% fossil-fuelled at 217 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
IP House
Operator
IP House
Est. capacity
~5-10 MW
Footprint
22,231 sq ft
Grid carbon
217 gCO₂/kWh
Clean electricity
64%
Region
United Kingdom
Overview
source: linkIP House London Datacentre is a mapped data center in London, United Kingdom, run by IP House. Reported footprint is 22,231 square feet. No ultimate parent for the operator appears in available records.
Operator chain
The grid behind this site
source: Ember · EurostatGrid carbon intensity
217 gCO₂/kWh
Clean electricity
64%
Fossil electricity
36%
National grid context, not this facility's own metering. Full country picture: United Kingdom data centers.
In the news
source: Google News (local + English)- Data centre and homes plan compete for Charlton Riverside siteBBC· Oct 4, 2026
- Inside London's data centres boom and the fierce local battles being waged around their futureLondon Evening Standard· Sep 15, 2026
- Major demonstration outside Ministry of Housing as campaign to Save Brick Lane from data centre heats up - Homes Not Data CentresLondon Daily News· Sep 4, 2026
- Is a massive data center hub heating up a town outside London?CBS News· Aug 24, 2026
- Another thirsty data centre approved in West LondonUK Property Forums· Aug 24, 2026
- Plans filed for 180MW data center development in South East London, UKData Center Dynamics· Aug 19, 2026
See something wrong or missing on this page? Suggest a correction.