Mapped (unverified)
Internet Central data center, Staffordshire, United Kingdom
Staffordshire, United Kingdom
Source: OpenStreetMap
Internet Central data center in Staffordshire, United Kingdom is a mapped facility, operated by Internet Central. It runs on United Kingdom's grid, which was 36% fossil-fuelled at 217 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Real parent
Internet Central
Operator
Internet Central
Grid carbon
217 gCO₂/kWh
Clean electricity
64%
Region
Staffordshire
Overview
source: linkInternet Central is a mapped data center in the United Kingdom, run by an operator of the same name. Available records describe it only as an Internet Central data center, with no ultimate parent, capacity, or footprint figures disclosed. Ownership above the operator is not detailed in the records reviewed.
Operator chain
- Ultimate parentInternet Central
- Files asInternet Central
- This facilityInternet Central data center
The grid behind this site
source: Ember · EurostatGrid carbon intensity
217 gCO₂/kWh
Clean electricity
64%
Fossil electricity
36%
National grid context, not this facility's own metering. Full country picture: United Kingdom data centers.
In the news
source: Google News (local + English)- Ukraine strikes Yandex data centre in third attack on Russian tech giantBBC· Oct 11, 2026
- Ukraine hits second major tech site, expanding range of targets inside RussiaReuters· Oct 9, 2026
- Data centre demand drives NI manufacturing boomBBC· Sep 17, 2026
- TFW Ffeibr’s Railway Full Fibre Network Connects to Europe’s Largest Data Centre CampusISPreview UK· Aug 22, 2026
- Top 10: Data Centre Companies in the UKData Centre Magazine· Aug 19, 2026
- Tekcapital rises on valuation uplift from geothermal-powered AI data centre investmentProactive Investors· Aug 6, 2026
See something wrong or missing on this page? Suggest a correction.