Mapped (unverified)colocation
Ibercom Madrid
Madrid, Comunidad de Madrid, Spain
Source: Primary source
Ibercom Madrid is a mapped data center in Comunidad de Madrid, Spain. It runs on Spain's grid, which was 25% fossil-fuelled at 154 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
154 gCO₂/kWh
Clean electricity
75%
DC power price
13.74¢/kWh
Region
Comunidad de Madrid
Overview
source: linkIbercom — colocation facility (3 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
154 gCO₂/kWh
Clean electricity
75%
Fossil electricity
25%
Data-center power price
13.74¢/kWh
A large data center in Spain pays 13.74¢/kWh for electricity — a household pays 24.08¢, 43% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Spain data centers.
In the news
source: Google News (local + English)- El Gobierno pretende frenar la subida de la luz exigiendo a los centros de datos un 80% de renovablesOkDiario· Aug 27, 2026
- Madrid asegura que los nuevos centros de datos reducen hasta un 90% su consumo de aguaData Center Dynamics· Aug 24, 2026
- La Comunidad de Madrid afirma que los nuevos centros de datos consumen el mismo agua en un año que 62 familiasCadena SER· Aug 24, 2026
- Centros de datos en Madrid: qué esconde el 90 por ciento de ahorro de aguaAquí Madrid· Aug 22, 2026
- Madrid lidera centros de datos eficientes y sosteniblesLa Voz de Madrid· Aug 21, 2026
- Global Switch inicia las obras de Madrid 2, un centro de datos de 56 MW que abrirá en 2029Noticias Logística y Transporte· Aug 20, 2026
See something wrong or missing on this page? Suggest a correction.