Mapped (unverified)colocation
Hermes Telecom DC
Antwerp, Vlaanderen, Belgium
Source: Primary source
Hermes Telecom DC is a mapped data center in Vlaanderen, Belgium. It runs on Belgium's grid, which was 20% fossil-fuelled at 133 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
133 gCO₂/kWh
Clean electricity
80%
DC power price
16.13¢/kWh
Region
Vlaanderen
Overview
source: linkHermes Telecom (Belgium) BVBA — colocation facility (4 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
133 gCO₂/kWh
Clean electricity
80%
Fossil electricity
20%
Data-center power price
16.13¢/kWh
A large data center in Belgium pays 16.13¢/kWh for electricity — a household pays 33.13¢, 51% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Belgium data centers.
In the news
source: Google News (local + English)- RTL België kiest voor Rittal kastsystemen voor gloednieuw datacenterEngineeringnet· Aug 20, 2026
- Oververhitte server fnuikt werking 2 Vlaamse ziekenhuizenITdaily· Jun 26, 2026
- Door hitte getroffen servers van UZA in Edegem zijn weer operationeel: "Alles kan vrijdag weer doorgaan"VRT· Jun 25, 2026
- Storing in UZA nog niet van de baan: hinder kan nog enkele uren aanhouden, afspraken op vrijdag gaan gewoon doornieuwsblad.be· Jun 25, 2026
- Vlaamse ziekenhuizen stellen operaties uit door oververhitte server in ParijsTweakers· Jun 25, 2026
- Niet-dringende operaties in AZ Sint-Lucas Gent en UZA Edegem blijven nog hele dag geschrapt door oververhitte serversVRT· Jun 25, 2026
See something wrong or missing on this page? Suggest a correction.