Google - Thornton is a mapped data center in Adams County, CO, operated by Google LLC and ultimately owned by Alphabet Inc.. DataCentersExposed has documented a 86,059 sq ft footprint at this site.

Reporting by · Updated Jun 14, 2026

Real parent
Alphabet Inc.
Operator
Google LLC
Est. capacity
~15-35 MW
Footprint
86,059 sq ft
Utility
Public Service Co of Colorado
Grid
PSCO
Attribution & capacity confidence:mediumprimary source

Overview

source: link

Google - Thornton is a mapped data center in Thorton, Adams County, Colorado, run by Google LLC and owned through its parent, Alphabet Inc. Records list a footprint of 86,059 square feet. The site draws power from Public Service Co of Colorado inside the PSCO balancing authority.

Operator chain

Grid & water — why here

source: HIFLD · EPA
Nearest substation
1.5 mi
Unknown203852 · 230 kV
Transmission line
0.3 mi
230 kV line
Municipal water
Served
Thornton City Of

The closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.

In the news

source: GDELT

Tax breaks & subsidies

source: Good Jobs First / GASB 77

No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.

Water use

Modeled estimate~88.8K gpd
Direct (onsite cooling)
~45.6K gpd
Indirect (its electricity)
~43.2K gpd

No measured record exists, so this is a low-confidence model from 5 MW (interconnection capacity): 1.8 L/kWh cooling (temperate climate) + 0.45 gal/kWh embedded in US grid average. How we estimate. Have a utility document? Send it and we'll replace this with the real figure.

EPA permits & violations

source: EPA ECHO

No reported violations as of last sync.

Air quality near this site

source: AirNow
77
O3
Moderate
38
PM10
Good
23
PM2.5
Good

Air Quality Index from the nearest AirNow reporting area (Denver-Boulder), as of 2026-06-10. Regional context — not this facility's own emissions.

Who lives nearby

source: Census ACS 2023
Median household income
$62K
People of color
51%
Below poverty
16%
Tract population
6,349

Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.

Nearest school

source: HIFLD / NCES

The nearest public school, Pathways Future Center in Thornton, is 686 ft from this site (390 students). 4 public schools sit within a mile of the site.

Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).

Hearings timeline

No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.