Google data center, Prince William County, VA
Prince William County, VA
Source: OpenStreetMap
Google data center in Prince William County, VA is a mapped facility, operated by Google LLC and ultimately owned by Alphabet Inc.. DataCentersExposed has documented a 289,621 sq ft footprint at this site.
Reporting by Eric Keller · Updated Jun 14, 2026
Overview
source: linkThis 289,621 square foot data center in Prince William County, Virginia, is operated by Google LLC and ultimately owned by Alphabet Inc. The mapped site draws power from Northern Virginia Electric Cooperative and sits within the PJM grid. Records list it simply as a Google data center.
Operator chain
- Ultimate parentAlphabet Inc.
- Files asGoogle LLC
- This facilityGoogle data center
Grid & water — why here
source: HIFLD · EPAThe closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.
In the news
source: GDELT- Google seeks to protect water while building data centers - WAVY.comWAVY.com· Aug 24, 2026
- Virginia Experts Concerned About Long-Term Water Impact of Google Data Center - WDBJ7WDBJ7· Aug 12, 2026
- Virginia experts concerned about long-term water impact of Google data center - WDBJ7WDBJ7· Aug 12, 2026
- Botetourt County Planning Commission split on water pipeline permit amid Google data center concerns - wdbj7.comwdbj7.com· Aug 11, 2026
- Google impresses with transparency, dedication to growing West Virginia’s workforce with planned data center in Putnam County - WCHS NetworkWCHS Network· Aug 9, 2026
- Botetourt board to create commission to assess Google data center project - Virginia BusinessVirginia Business· Jul 30, 2026
Tax breaks & subsidies
source: Good Jobs First / GASB 77No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.
Virginia reported $1B in Data Center Retail Sales and Use Tax Exemption (Va. Code § 58.1-609.3(18)) for FY2024 (Virginia Joint Legislative Audit and Review Commission (JLARC) / Weldon Cooper Center). Program-wide, not attributable to this site.
Water use
No measured record exists, so this is a low-confidence model from 175 MW (interconnection capacity): 1.8 L/kWh cooling (temperate climate) + 0.5 gal/kWh embedded in PJM grid mix. How we estimate. Have a utility document? Send it and we'll replace this with the real figure.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
What this site costs the grid
source: PJM RPM auction reportsPJM's capacity auction sets a $/MW-day price that utilities pass on to every household and business in the zone. This site sits in PJM's DOM pricing zone, where soaring data-center demand is a documented driver. See the full zone-by-zone breakdown →
An estimated ~55 to 120 MW of load at the zone's $333/MW-day, annualized — the capacity charge a load this size carries at the current auction price. Estimated from the building footprint at 200 to 400 W/ft² (the typical range for modern data centers). A rough order-of-magnitude figure, not a metered or permitted capacity.
Separately, a typical home in this zone pays an estimated $4 to $10/mo more on the capacity portion of its bill that PJM's market monitor attributes to data-center demand. See your address's full impact →
Air quality near this site
source: AirNowAir Quality Index from the nearest AirNow reporting area (Northern Virginia), as of 2026-06-10. Regional context — not this facility's own emissions.
Who lives nearby
source: Census ACS 2023Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.
Nearest school
source: HIFLD / NCESThe nearest public school, Piney Branch Elementary in Bristow, is 0.5 mi from this site (766 students). 5 public schools sit within a mile of the site.
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.