Google data center, Berkeley County, SC

Berkeley County, SC

Source: OpenStreetMap

Google data center in Berkeley County, SC is a mapped facility, operated by Google LLC and ultimately owned by Alphabet Inc.. DataCentersExposed has documented a 181,261 sq ft footprint at this site.

Reporting by · Updated Jun 14, 2026

Real parent
Alphabet Inc.
Operator
Google LLC
Est. capacity
~35-75 MW
Footprint
181,261 sq ft
Water
7.5K gpd
Utility
Berkeley Electric Coop INC
Grid
SC
Attribution & capacity confidence:mediumprimary source
Status · click to filter

Most sites are mapped — located but awaiting a second source. How we verify

Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.

Overview

source: link

This is a mapped Google data center in Berkeley County, South Carolina, operated by Google LLC and held through its ultimate parent, Alphabet Inc. Public records put its footprint at 181,261 square feet. The site draws power from Berkeley Electric Coop INC within the South Carolina grid.

Operator chain

In the news

source: GDELT

Tax breaks & subsidies

source: Good Jobs First / GASB 77

These tax breaks are recorded to Alphabet Inc. (the operator/parent) and may cover this or other sites — no state names the recipient at the facility level.

Total to this operator: $31.7M
  • Texas Qualifying Large Data Center Project Exemption$0
    State of Texas · granted 2026 · term yr · source
  • Texas Qualifying Large Data Center Project Exemption$0
    State of Texas · granted 2025 · term yr · source
  • Texas Qualifying Large Data Center Project Exemption$0
    State of Texas · granted 2025 · term yr · source
  • Texas Qualifying Large Data Center Project Exemption$0
    State of Texas · granted 2025 · term yr · source
  • Texas Qualifying Data Center Exemption$0
    State of Texas · granted 2025 · term yr · source
  • Chapter 312 — Midlothian Technology Reinvestment Zone No. 14 (City of Midlothian data-center zone)$16,044,286
    Ellis County, TX · granted 2024 · term yr · source
  • Chapter 312 — Midlothian Technology Reinvestment Zone No. 14 (City of Midlothian data-center zone)$15,660,346
    Ellis County, TX · granted 2024 · term yr · source
  • Texas Qualifying Large Data Center Project Exemption$0
    State of Texas · granted 2022 · term yr · source
  • Texas Qualifying Large Data Center Project Exemption$0
    State of Texas · granted 2018 · term yr · source

Water use

  • Reported consumption2.1M gpd
    2023 · consumption · reported as “Google Berkeley County” · source
  • Reported withdrawal7.5K gpd
    2021 · groundwater · matched by location (169 m, medium confidence) · source
  • Reported withdrawal7.9K gpd
    2020 · groundwater · matched by location (169 m, medium confidence) · source
  • Reported withdrawal424.1K gpd
    2019 · groundwater · matched by location (169 m, medium confidence) · source
  • Reported withdrawal97.3K gpd
    2018 · groundwater · matched by location (169 m, medium confidence) · source

Location-matched records come from state withdrawal reporting, which redacts owner names in the public release. A nearby withdrawal point is circumstantial evidence — the distance and confidence shown are part of the claim.

EPA permits & violations

source: EPA ECHO

No reported violations as of last sync.

Air quality near this site

source: AirNow
53
PM2.5
Moderate
38
O3
Good
33
PM10
Good

Air Quality Index from the nearest AirNow reporting area (Charleston), as of 2026-06-10. Regional context — not this facility's own emissions.

Who lives nearby

source: Census ACS 2023
Median household income
$76.6K
People of color
42%
Below poverty
7%
Tract population
6,533

Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.

Nearest school

source: HIFLD / NCES

The nearest public school, Foxbank Elementary in Moncks Corner, is 2.6 mi from this site (1,028 students).

Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).

Hearings timeline

No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.