Mapped (unverified)colocation
Glesys Tampere 1
Tampere, Pirkanmaa, Finland
Source: Primary source
Glesys Tampere 1 is a mapped data center in Pirkanmaa, Finland. It runs on Finland's grid, which was 4% fossil-fuelled at 57 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
57 gCO₂/kWh
Clean electricity
96%
DC power price
6.53¢/kWh
Region
Pirkanmaa
Overview
source: linkGlesys AB — colocation facility (6 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
57 gCO₂/kWh
Clean electricity
96%
Fossil electricity
4%
Data-center power price
6.53¢/kWh
A large data center in Finland pays 6.53¢/kWh for electricity — a household pays 23.19¢, 72% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Finland data centers.
In the news
source: Google News (local + English)- Luotettavaa datakeskus- ja infrastruktuuriosaamistaTekniikka&Talous· Oct 9, 2026
- Jämsän sivistysjohtajan virkaan 45 hakijaa, mukana kuusi jämsäläistäJämsän Seutu· Sep 25, 2026
- Tekstarit | Datakeskus- ja tuulivoimahuumassa unohtuu, että luonnonvarat ja puhdas vesi ovat rajallisiaAamulehti· Sep 19, 2026
- Datakeskukset lupaavat paljon ja vievät enemmän – Energiakriisi tulossavasen kaista· Sep 9, 2026
- "Ihastuimme kivaan paikkaan Tampereen kainalossa" - Ruutana koetaan turvalliseksi asuinalueeksi, mutta bussiyhteyksissä ei ole kehumistaKangasalan Sanomat· Jul 29, 2026
- Nokian vanhoihin tiloihin Oulussa rakennetaan iso datakeskusYle· Jun 4, 2026
See something wrong or missing on this page? Suggest a correction.