Mapped (unverified)
Elisa
Tampere, Pirkanmaa, Finland
Source: OpenStreetMap
Elisa is a mapped data center in Pirkanmaa, Finland. It runs on Finland's grid, which was 4% fossil-fuelled at 57 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 12, 2026
Real parent
—
Operator
—
Grid carbon
57 gCO₂/kWh
Clean electricity
96%
DC power price
6.53¢/kWh
Region
Pirkanmaa
Status · click to filter
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkdata center
The grid behind this site
source: Ember · EurostatGrid carbon intensity
57 gCO₂/kWh
Clean electricity
96%
Fossil electricity
4%
Data-center power price
6.53¢/kWh
A large data center in Finland pays 6.53¢/kWh for electricity — a household pays 23.19¢, 72% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Finland data centers.
In the news
source: Google News (local + English)- Nokian entisiin tiloihin Ruskoon valmistuu datakeskuskampusKaleva· Jun 4, 2026
- Nokian vanhoihin tiloihin Oulussa rakennetaan iso datakeskusYle· Jun 4, 2026
- Helsinki | Koska lunta ei saa enää kipata mereen, se läjitetään metsäänHS.fi· Jun 2, 2026
- Pääkirjoitus 7.5.2026 | Datakeskukset tuovat niukasti arvoa SuomeenKeskisuomalainen· May 6, 2026
- Datakeskukset | Satakunnassa jo 15 vuotta toiminut datakeskus piileksii yllättävässä paikassa – Tältä siellä näyttääSatakunnan Kansa· Feb 18, 2026
- Millainen ongelma datakeskukset ovat Suomen sähkön kantaverkolle?Tekniikan Maailma· Feb 5, 2026