Mapped (unverified)colocation
Gigahost Sandefjord
Sandefjord, Vestfold, Norway
Source: Primary source
Gigahost Sandefjord is a mapped data center in Vestfold, Norway. It runs on Norway's grid, which was 1% fossil-fuelled at 28 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
28 gCO₂/kWh
Clean electricity
99%
DC power price
6.47¢/kWh
Region
Vestfold
Overview
source: linkGigahost AS — colocation facility (18 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
28 gCO₂/kWh
Clean electricity
99%
Fossil electricity
1%
Data-center power price
6.47¢/kWh
A large data center in Norway pays 6.47¢/kWh for electricity — a household pays 19.02¢, 66% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Norway data centers.
In the news
source: Google News (local + English)- (+) Skal bygge Matbørsen-bygg for 360 millionerBygg.no· Jun 17, 2026
- Nytt bransjeforum samler ledende aktører fra datasenter- og byggsektorenByggfakta Nyheter· May 7, 2026
- Derfor satser Statkraft på datasentreDigi.no· Apr 22, 2026
- Omstridt datasenter gjenoppstår med norske eiereTechWatch· Nov 10, 2025
- Kjøpte tilbake tvangsavviklet datasenter – unngår gigasøksmålDigi.no· Nov 10, 2025
- Søker ny prosjektleder etter oppsigelse på Google-tomtavarden.no· Aug 29, 2024
See something wrong or missing on this page? Suggest a correction.