Mapped (unverified)colocation
Basefarm OSL5
Rasta, Akershus, Norway
Source: Primary source
Basefarm OSL5 is a mapped data center in Akershus, Norway. It runs on Norway's grid, which was 1% fossil-fuelled at 28 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
28 gCO₂/kWh
Clean electricity
99%
DC power price
6.47¢/kWh
Region
Akershus
Overview
source: linkBasefarm AS — colocation facility (12 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
28 gCO₂/kWh
Clean electricity
99%
Fossil electricity
1%
Data-center power price
6.47¢/kWh
A large data center in Norway pays 6.47¢/kWh for electricity — a household pays 19.02¢, 66% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Norway data centers.
In the news
source: Google News (local + English)- (+) Skygard kjøper to datasentre fra Orangecw.no· Jan 9, 2026
- Basefarm åpnet Oslo-regionens største datasenter: – Det er bedre å ha datasenteret lokalt, enn på avsidesliggende stederDigi.no· Nov 17, 2017
- Næringsliv, Nyheter | Åpner Østlandets største datasenter i marsRomerikes Blad· Dec 17, 2015
- Flex Pitches AI Data Center Spin-Off as Power and Cooling Growth AcceleratesYahoo Finance· May 23, 2026
See something wrong or missing on this page? Suggest a correction.