Mapped (unverified)colocation
Genova Digital Hub
Genoa, Liguria, Italy
Source: Primary source
Genova Digital Hub is a mapped data center in Liguria, Italy. It runs on Italy's grid, which was 51% fossil-fuelled at 285 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
285 gCO₂/kWh
Clean electricity
49%
DC power price
18.69¢/kWh
Region
Liguria
Overview
source: linkTelecom Italia Sparkle S.p.A. — colocation facility (1 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
285 gCO₂/kWh
Clean electricity
49%
Fossil electricity
51%
Data-center power price
18.69¢/kWh
A large data center in Italy pays 18.69¢/kWh for electricity — a household pays 31.11¢, 40% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Italy data centers.
In the news
source: Google News (local + English)- Ucraina-Russia, nuovo affondo di Trump: "Putin vorrebbe accordo ma Zelensky no"Startupbusiness.it· Oct 11, 2026
- Dalla genovese Asg un cavo superconduttore a zero perdite per i data centerIl Secolo XIX· Jul 21, 2026
- Ansaldo Energia torna sul mercato Usa dopo 30 anni: accordo per un data center in TexasGenova24· Jul 20, 2026
- Ansaldo Energia torna negli Stati Uniti dopo oltre trent'anni: maxi commessa per otto turbine destinate a un data center in TexasTelenord· Jul 20, 2026
- Morandi Bridge: verdict expected in the early afternoon, around 2 pmIl Sole 24 ORE· Jul 16, 2026
- Ponte Morandi: verdetto atteso nel primo pomeriggio, intorno alle 14Il Sole 24 ORE· Jul 16, 2026
See something wrong or missing on this page? Suggest a correction.