Mapped (unverified)colocation
Ampersand La Spezia
La Spezia, Liguria, Italy
Source: Primary source
Ampersand La Spezia is a mapped data center in Liguria, Italy. It runs on Italy's grid, which was 51% fossil-fuelled at 285 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
285 gCO₂/kWh
Clean electricity
49%
DC power price
18.69¢/kWh
Region
Liguria
Overview
source: linkAmpersand Srl — colocation facility (2 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
285 gCO₂/kWh
Clean electricity
49%
Fossil electricity
51%
Data-center power price
18.69¢/kWh
A large data center in Italy pays 18.69¢/kWh for electricity — a household pays 31.11¢, 40% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Italy data centers.
In the news
source: Google News (local + English)- Polo della subacquea, la Regione Liguria entra con 10 milioni di euroIl Sole 24 ORE· May 5, 2026
- Sicurezza digitale e futuro delle professioni ICT: successo per le visite al data center InsielRaiNews· Apr 23, 2026
- Policlinico San Martino, migrazione dei servizi informatici completata senza disagiRaiNews· Oct 22, 2025
- Genova sempre più digitale grazie al nuovo Edge Data Center costruito da Rai Way a GranaroloRaiNews· Dec 3, 2024
- Il fondo BlackRock interessato alle ex centrali Enel per l’installazione di data centerCittà della Spezia· Oct 1, 2024
- Telecamere hi-tech per la sicurezza. Brugnato centra il finanziamento e potenzia la videosorveglianzaLa Nazione· Aug 28, 2024
See something wrong or missing on this page? Suggest a correction.