Mapped (unverified)colocation
EXA Edge DC Zaventem
Zaventem, Vlaanderen, Belgium
Source: Primary source
EXA Edge DC Zaventem is a mapped data center in Vlaanderen, Belgium. It runs on Belgium's grid, which was 20% fossil-fuelled at 133 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
133 gCO₂/kWh
Clean electricity
80%
DC power price
16.13¢/kWh
Region
Vlaanderen
Overview
source: linkEXA Infrastructure — colocation facility (2 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
133 gCO₂/kWh
Clean electricity
80%
Fossil electricity
20%
Data-center power price
16.13¢/kWh
A large data center in Belgium pays 16.13¢/kWh for electricity — a household pays 33.13¢, 51% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Belgium data centers.
In the news
source: Google News (local + English)- Bedrijf plaatst kunstwerk op dak gloednieuw datacenter: “Eyecatcher vanop Ring”Nieuwsblad· Mar 30, 2026
- Cegeka overweegt nieuw datacenter onder de grond te stoppenDe Tijd· Dec 12, 2025
- Microsoft opent officieel Azure Belgium Central met drie datacenterscomputable.be· Nov 20, 2025
- Datacenter United investeert 120 miljoen euro in uitbreiding Belgische datacentersITdaily· Sep 30, 2025
- Microsoft neemt drie nieuwe datacenters rondom Brussel in herfst 2025 in gebruikTweakers· Mar 12, 2025
- Datacenters, het nieuwe zwarte goud, lokken miljarden naar BelgiëDe Tijd· May 29, 2024
See something wrong or missing on this page? Suggest a correction.