Mapped (unverified)colocation
Eurofiber DC - TLS00
Toulouse, Occitanie, France
Source: Primary source
Eurofiber DC - TLS00 is a mapped data center in Occitanie, France. It runs on France's grid, which was 5% fossil-fuelled at 41 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
41 gCO₂/kWh
Clean electricity
95%
DC power price
12.24¢/kWh
Region
Occitanie
Overview
source: linkEurofiber France — colocation facility (22 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
41 gCO₂/kWh
Clean electricity
95%
Fossil electricity
5%
Data-center power price
12.24¢/kWh
A large data center in France pays 12.24¢/kWh for electricity — a household pays 29.26¢, 58% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: France data centers.
In the news
source: Google News (local + English)- Haute-Garonne - Telespazio France étend son rôle d’opérateur au NewSpaceLa Lettre M· Jul 3, 2026
- ETIX frappe fort : le géant français des data centers rachète 4 sites en Occitanie pour s’imposer face aux mastodontes du numériqueladepeche.fr· Jun 2, 2026
- Choose France 2026 en OccitanieLes services de l'État en région· Jun 2, 2026
- Choose France : des investissements en Occitanie dans le textile et les technologies de pointeladepeche.fr· Jun 1, 2026
- APL Data Center change d’échelle avec un chiffre d’affaires en hausse de 84%ChannelNews· May 28, 2026
- Un centre de données 100 % local, électricité décarbonée, égalité femmes-hommes : en Aveyron, Inforsud technologies, une trajectoire déterminée vers un numérique responsableCentre Presse Aveyron· May 23, 2026
See something wrong or missing on this page? Suggest a correction.