Euclyde DC5 is a mapped data center in Auvergne-Rhône-Alpes, France, operated by Euclyde. DataCentersExposed has documented a 13,450 sq ft footprint and 1 environmental-permit record at this site. It runs on France's grid, which was 5% fossil-fuelled at 41 gCO₂e/kWh in 2025 (Ember).

Reporting by · Updated Jun 14, 2026

Real parent
Euclyde
Operator
Euclyde
Footprint
13,450 sq ft
Grid carbon
41 gCO₂/kWh
Clean electricity
95%
DC power price
12.24¢/kWh
Region
Auvergne-Rhône-Alpes
Attribution & capacity confidence:mediumprimary source
Status · click to filter

Most sites are mapped — located but awaiting a second source. How we verify

Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.

Overview

source: link

Euclyde DC5 is a mapped data center in France, operated by Euclyde. Available records describe it as a Euclyde data center, with a reported footprint of 13,450 square feet. No parent company above Euclyde is disclosed in available records.

Operator chain

The grid behind this site

source: Ember · Eurostat
Grid carbon intensity
41 gCO₂/kWh
Clean electricity
95%
Fossil electricity
5%
Data-center power price
12.24¢/kWh

A large data center in France pays 12.24¢/kWh for electricity — a household pays 29.26¢, 58% more than the data center (Eurostat).

National grid context, not this facility's own metering. Full country picture: France data centers.

Environmental permits

source: Géorisques (ICPE)
  • ICPE Enregistrement · Villeurbanne 69100 · registered as "SPEL" · ~52 m from the mapped location