Mapped (unverified)colocation
ETIX Lyon #1
Lyon, Auvergne-Rhône-Alpes, France
Source: Primary source
ETIX Lyon #1 is a mapped data center in Auvergne-Rhône-Alpes, France. It runs on France's grid, which was 5% fossil-fuelled at 41 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
41 gCO₂/kWh
Clean electricity
95%
DC power price
12.24¢/kWh
Region
Auvergne-Rhône-Alpes
Status · click to filter
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkEtix Everywhere — colocation facility (27 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
41 gCO₂/kWh
Clean electricity
95%
Fossil electricity
5%
Data-center power price
12.24¢/kWh
A large data center in France pays 12.24¢/kWh for electricity — a household pays 29.26¢, 58% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: France data centers.
In the news
source: Google News (local + English)- Un data center de 200 millions d’euros à Saint-Priest : la consultation publique a démarré, des interrogations émergentLe Progrès· Jun 13, 2026
- Economie. Ils sont indispensables à l'IA : y a-t-il un data center près de chez vous?Le Progrès· Jun 11, 2026
- Le premier data center de Dardilly passe sous les radarsRue89 Lyon· Jun 10, 2026
- Data centers : le nouveau défi électrique de RTE en Auvergne-Rhône-Alpesmesinfos· Jun 5, 2026
- Pourquoi un data center dédié à l’IA va ouvrir près de LyonLyon Capitale· May 26, 2026
- Le Club lyonnais de l'immobilier et de la construction passe les data centers au révélateurmesinfos· May 26, 2026
See something wrong or missing on this page? Suggest a correction.