Equinix WA3
województwo mazowieckie, Poland
Source: OpenStreetMap
Equinix WA3 is a mapped data center in województwo mazowieckie, Poland, operated by Equinix, Inc.. DataCentersExposed has documented a 109,371 sq ft footprint at this site. It runs on Poland's grid, which was 69% fossil-fuelled at 591 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkEquinix WA3 is a mapped data center in Poland operated by Equinix, Inc. Available records list a footprint of 109,371 square feet. Ownership above Equinix, Inc. is not detailed in the facts on file.
Operator chain
- Ultimate parentEquinix, Inc.
- Files asEquinix, Inc.
- This facilityEquinix WA3
The grid behind this site
source: Ember · EurostatA large data center in Poland pays 21.48¢/kWh for electricity — a household pays 24.77¢, 13% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Poland data centers.
In the news
source: Google News (local + English)- GPW przenosi swój nowy system transakcyjnyComputerworld.pl· Oct 9, 2023
- Giełda Papierów Wartościowych w Warszawie zmigruje do centrum danych EquinixITwiz· Oct 9, 2023
- Equinix rozbuduje europejską infrastrukturęITwiz· Feb 20, 2023
- Polski Equinix w pełnej mobilizacjipb.pl· Jul 5, 2022
- Poznaj PLIX – największy punkt wymiany ruchu internetowego Equinix w regionie EMEATelepolis.pl· Jun 11, 2021
- Equinix rozbudowuje warszawskie centrum danychITwiz· Oct 8, 2020