Equinix TY3
江東区, Tokyo, Japan
Source: OpenStreetMap
Equinix TY3 is a mapped data center in Tokyo, Japan, operated by Equinix, Inc.. DataCentersExposed has documented a 18,237 sq ft footprint at this site. It runs on Japan's grid, which was 67% fossil-fuelled at 477 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Real parent
Equinix, Inc.
Operator
Equinix, Inc.
Est. capacity
~5-10 MW
Footprint
18,237 sq ft
Grid carbon
477 gCO₂/kWh
Clean electricity
33%
Region
Tokyo
Overview
source: linkEquinix TY3 is a mapped data center in Koto City (江東区), Japan, run by Equinix, Inc. Available records put its footprint at 18,237 square feet. Beyond its identification as an Equinix data center, the site's ownership chain above Equinix, Inc. is not detailed in the facts on hand.
Operator chain
- Ultimate parentEquinix, Inc.
- Files asEquinix, Inc.
- This facilityEquinix TY3
The grid behind this site
source: Ember · EurostatGrid carbon intensity
477 gCO₂/kWh
Clean electricity
33%
Fossil electricity
67%
National grid context, not this facility's own metering. Full country picture: Japan data centers.
In the news
source: Google News (local + English)- 日本に進出する外資系データセンターまとめ記事2024~2025【特集】データセンターカフェ· Oct 31, 2025
- (仮称)久太郎町ビル新築工事 エクイニクス・ジャパンが堺筋本町に『高層データセンター』を建設 現地の最新情報 25.09【2028年11月末竣工】再都市化· Oct 9, 2025
- あの印西でも反対の声、AI立国に向けてオープンなデータセンター議論が必要だ(2ページ目)日経クロステック· Jun 6, 2025
- 日本発で量子サービス、英OQCがエクイニクスと協業する狙いニュースイッチ by 日刊工業新聞社· Mar 20, 2023
- 都内一等地に密かに進出する〝DC〟の今 近年は東京集中への議論も朝日新聞· Nov 4, 2022
- エクイニクス「OS2x」大阪・彩都のデータセンターを拡張!最終フェーズ完成時に14MWのIT電力を供給【2024年8月竣工予定】再都市化· Aug 9, 2022