Mapped (unverified)
Equinix ME1
Victoria, Australia
Source: OpenStreetMap
Equinix ME1 is a mapped data center in Victoria, Australia, operated by Equinix, Inc.. DataCentersExposed has documented a 101,894 sq ft footprint at this site. It runs on Australia's grid, which was 61% fossil-fuelled at 525 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Aug 27, 2026
Real parent
Equinix, Inc.
Operator
Equinix, Inc.
Est. capacity
~20-45 MW
Footprint
101,894 sq ft
Grid carbon
525 gCO₂/kWh
Clean electricity
39%
Region
Victoria
Overview
source: linkEquinix ME1 is a mapped data center in Australia, run by Equinix, Inc. Available records put its footprint at 101,894 square feet. No corporate parent above Equinix, Inc. is disclosed in the available facts, and details beyond its identification as an Equinix data center remain limited.
Operator chain
- Ultimate parentEquinix, Inc.
- Files asEquinix, Inc.
- This facilityEquinix ME1
The grid behind this site
source: Ember · EurostatGrid carbon intensity
525 gCO₂/kWh
Clean electricity
39%
Fossil electricity
61%
National grid context, not this facility's own metering. Full country picture: Australia data centers.
In the news
source: Google News (local + English)- Equinix names Jarrod Nink as Managing Director for AustraliaIT Brief Australia· Jul 27, 2026
- Equinix Appoints Jarrod Nink to Lead Australian Data Centre BusinessET Datacenters· Jul 27, 2026
- Equinix appoints former Vocus executive Jarrod Nink to lead Australian businessw.media· Jul 27, 2026
- Equinix appoints former Vocus exec Jarrod Nink to lead Australian businessTelecompaper· Jul 27, 2026
- Why all the controversy over data centres? We explainSMH.com.au· Jun 13, 2026
- Equinix to open IBX data centre in Kuala LumpurTelecompaper· May 12, 2026
See something wrong or missing on this page? Suggest a correction.