Equinix Ashburn DC1
21711 Filigree Court · Ashburn, Loudoun County, VA
Source: OpenStreetMap
Equinix Ashburn DC1 is a mapped data center in Loudoun County, VA, operated by Equinix, Inc.. DataCentersExposed has documented a 59,757 sq ft footprint at this site.
Reporting by Eric Keller · Updated Jun 12, 2026
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkEquinix data center
Operator chain
- Ultimate parentEquinix, Inc.
- Files asEquinix, Inc.
- This facilityEquinix Ashburn DC1
In the news
source: Google News- Loudoun students tour Equinix data center in AshburnLoudoun Times-Mirror· Jun 12, 2026
- US' National Science Foundation seeks to reduce data center footprintData Center Dynamics· Apr 15, 2026
- Equinix pitches expansion of its Data Center Alley footprintThe Business Journals· Mar 25, 2026
- Equinix Eyes Bigger Footprint In Ashburn’s Data Center AlleyHoodline· Mar 25, 2026
- Data Centers’ Use of Diesel Generators for Backup Power Is Commonplace—and ProblematicInside Climate News· Nov 12, 2025
- How Did This State Become the Data Center Capital of the World?Inside Climate News· Oct 26, 2025
Tax breaks & subsidies
source: Good Jobs First / GASB 77These tax breaks are recorded to Equinix, Inc. (the operator/parent) and may cover this or other sites — no state names the recipient at the facility level.
- The Climate Change Agreement$0HMRC, United Kingdom · granted 2022 · term — yr · source
- The Climate Change Agreement$0HMRC, United Kingdom · granted 2022 · term — yr · source
Virginia reported $1B in Data Center Retail Sales and Use Tax Exemption (Va. Code § 58.1-609.3(18)) for FY2024 (Virginia Joint Legislative Audit and Review Commission (JLARC) / Weldon Cooper Center). Program-wide, not attributable to this site.
Water use
No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
What this site costs the grid
source: PJM RPM auction reportsPJM's capacity auction sets a $/MW-day price that utilities pass on to every household and business in the zone. This site sits in PJM's DOM pricing zone, where soaring data-center demand is a documented driver. See the full zone-by-zone breakdown →
An estimated ~10 to 25 MW of load at the zone's $333/MW-day, annualized — the capacity charge a load this size carries at the current auction price. Estimated from the building footprint at 200 to 400 W/ft² (the typical range for modern data centers). A rough order-of-magnitude figure, not a metered or permitted capacity.
Separately, a typical home in this zone pays an estimated $4 to $10/mo more on the capacity portion of its bill that PJM's market monitor attributes to data-center demand. See your address's full impact →
Nearest school
source: HIFLD / NCESThe nearest public school, Discovery Elementary in Ashburn, is 1.0 mi from this site (710 students).
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.