ennit GmbH
Kiel, Schleswig-Holstein, Germany
Source: OpenStreetMap
ennit GmbH is a mapped data center in Schleswig-Holstein, Germany, operated by TNG Group. It runs on Germany's grid, which was 41% fossil-fuelled at 330 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkennit GmbH is a mapped data center in Kiel, Germany, operated by TNG Group. Available records identify it as a TNG Group data center but do not disclose an ultimate parent above the operator. No capacity, footprint, or environmental enforcement figures appear in the available record.
Operator chain
The grid behind this site
source: Ember · EurostatA large data center in Germany pays 21.56¢/kWh for electricity — a household pays 39.43¢, 45% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Germany data centers.
In the news
source: Google News (local + English)No recent coverage found for this facility.