Mapped (unverified)colocation
Hoern Campus Kiel
Kiel, Schleswig-Holstein, Germany
Source: Primary source
Hoern Campus Kiel is a mapped data center in Schleswig-Holstein, Germany. It runs on Germany's grid, which was 41% fossil-fuelled at 330 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
330 gCO₂/kWh
Clean electricity
59%
DC power price
21.56¢/kWh
Region
Schleswig-Holstein
Overview
source: linkADDIX Internet Services GmbH — colocation facility (2 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
330 gCO₂/kWh
Clean electricity
59%
Fossil electricity
41%
Data-center power price
21.56¢/kWh
A large data center in Germany pays 21.56¢/kWh for electricity — a household pays 39.43¢, 45% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Germany data centers.
In the news
source: Google News (local + English)- Uni Kiel verpasst Exzellenz-Titel – Uni Lübeck setzt auf KILübecker Nachrichten· Oct 2, 2026
- Nachfolger von Windows: Staatskanzlei Kiel stellt auf Linux umheise online· Sep 21, 2026
- Rechenzentren-Boom stellt Kommunen im Norden vor HerausforderungenNDR.de· Aug 28, 2026
- Setzt Lyten in Heide auf Rüstungstechnik?Kieler Nachrichten· Jul 21, 2026
- Projekt Rechenzentrum Schuby: Jetzt ist Kiel am BallNDR.de· May 21, 2026
- Größer als Northvolt: Verdoppeln Rechenzentren Schleswig-Holsteins Stromverbrauch?NDR.de· May 21, 2026
See something wrong or missing on this page? Suggest a correction.