Mapped (unverified)colocation
EdgeX by HGC
Tsing Yi, Hong Kong
Source: Primary source
EdgeX by HGC is a mapped data center in Hong Kong. It runs on Hong Kong's grid, which was 99% fossil-fuelled at 676 gCO₂e/kWh in 2024 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
676 gCO₂/kWh
Clean electricity
1%
Region
Hong Kong
Overview
source: linkHGC Global Communications Limited — colocation facility (6 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
676 gCO₂/kWh
Clean electricity
1%
Fossil electricity
99%
National grid context, not this facility's own metering. Full country picture: Hong Kong data centers.
In the news
source: Google News (local + English)- At least one dead after Tsing Yi traffic accidentgbcode.rthk.hk· May 14, 2026
- Temasek’s Mapletree Investments returns to profit, hits record AUM of S$80.3 billion in FY2025The Business Times· Jun 3, 2025
- Global Engine Group Holding (GLE) Stock Price, News & AnalysisStock Titan· Apr 25, 2025
- Mapletree Buys Logistics Site in Hong Kong's Tsing Yi for $473MMingtiandi· Feb 26, 2025
- Global Engine Group Holding (GLE) Stock NewsStock Titan· Sep 20, 2024
- The Road to Net Zero: Delivering a Sustainable Data Centre FutureHKTDC Research· Nov 2, 2022
See something wrong or missing on this page? Suggest a correction.