Mapped (unverified)colocation
EdgeUno Datacenter Queretaro Mexico (QRO2)
Queretaro, Querétaro, Mexico
Source: Primary source
EdgeUno Datacenter Queretaro Mexico (QRO2) is a mapped data center in Querétaro, Mexico. It runs on Mexico's grid, which was 74% fossil-fuelled at 474 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
474 gCO₂/kWh
Clean electricity
26%
Region
Querétaro
Overview
source: linkEdgeUno, Inc. — colocation facility (1 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
474 gCO₂/kWh
Clean electricity
26%
Fossil electricity
74%
National grid context, not this facility's own metering. Full country picture: Mexico data centers.
In the news
source: Google News (local + English)- Centros de Datos no son una panacea, sino un eslabón para el crecimiento económico: EbrardPlaza de Armas | Querétaro· Aug 21, 2026
- KIO invierte 170 mdd en Querétaro y prepara un tercer centro de datos - Diario de QuerétaroEl Sol de México· Aug 21, 2026
- Colón paga con agua y luz el auge de los Data Centers en QuerétaroTribuna de Querétaro· Aug 19, 2026
- México descarta convertirse en “data center global”, pero defiende centros de datos en Querétaro pese a alto consumo de aguaInfobae· Aug 18, 2026
- México no debe ser centro de datos: Sheinbaum advierte por el alto consumo de energía y aguaLa Jornada Hidalgo· Aug 18, 2026
- KIO Data Centers supera los 900 mdd de inversión y prepara expansión histórica en QuerétaroITSitio· Aug 17, 2026
See something wrong or missing on this page? Suggest a correction.