Mapped (unverified)colocation
Bleeding Edge QRO1
El Marqués, Querétaro, Mexico
Source: Primary source
Bleeding Edge QRO1 is a mapped data center in Querétaro, Mexico. It runs on Mexico's grid, which was 74% fossil-fuelled at 474 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
474 gCO₂/kWh
Clean electricity
26%
Region
Querétaro
Overview
source: linkBleeding Edge — colocation facility (1 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
474 gCO₂/kWh
Clean electricity
26%
Fossil electricity
74%
National grid context, not this facility's own metering. Full country picture: Mexico data centers.
In the news
source: Google News (local + English)- Microsoft desarrolla centro de datos en QuerétaroGrupo en Concreto· Oct 2, 2026
- Centros de datos, alto costo ambiental y pocos beneficiosEl Economista· Sep 1, 2026
- Los centros de datos: génesis de nuevas zonas de sacrificioTribuna de Querétaro· Aug 31, 2026
- Alertan de acaparar agua y energía por centros de datosReforma· Aug 31, 2026
- KIO invierte 170 mdd en Querétaro y prepara un tercer centro de datos - Diario de QuerétaroEl Sol de México· Aug 21, 2026
- Las dudas de vecinos de La Cartuja (Zaragoza) sobre el futuro centro de datos de AWS: del riesgo de inundación a los futuros pisosheraldo.es· Aug 20, 2026
See something wrong or missing on this page? Suggest a correction.