Mapped (unverified)colocation
Bleeding Edge QRO1
El Marqués, Querétaro, Mexico
Source: Primary source
Bleeding Edge QRO1 is a mapped data center in Querétaro, Mexico. It runs on Mexico's grid, which was 74% fossil-fuelled at 474 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
474 gCO₂/kWh
Clean electricity
26%
Region
Querétaro
Overview
source: linkBleeding Edge — colocation facility (1 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
474 gCO₂/kWh
Clean electricity
26%
Fossil electricity
74%
National grid context, not this facility's own metering. Full country picture: Mexico data centers.
In the news
source: Google News (local + English)- KIO invierte 170 mdd en Querétaro y prepara un tercer centro de datos - Diario de QuerétaroEl Sol de México· Aug 21, 2026
- KIO proyecta invertir 1,300 mdd en nuevo centro de datosEl Queretano· Aug 13, 2026
- “Crecer sin dejar a nadie atrás”: El Marqués alinea el boom de data centers con calidad de vida y desarrollo sostenibleData Center Dynamics· Jan 26, 2026
- Lanza Odata su data center más grande del país; se ubica en El Marqués - Diario de QuerétaroEl Sol de México· May 1, 2025
- Invertirán 400 mdd para Centros de Datos de Equinix en Querétaro y MonterreyAl Diálogo· Mar 16, 2025
- La sequía del futuro: cuando el agua se intercambia por datosZona Docs· Oct 28, 2024
See something wrong or missing on this page? Suggest a correction.