EdgeConneX potential Data Center
Bastrop, Bastrop County, TX
Source: Primary source
EdgeConneX potential Data Center is a proposed data center in Bastrop County, TX, operated by EdgeConneX, Inc..
Reporting by Eric Keller · Updated Jun 18, 2026
Overview
source: linkImported from the FracTracker Alliance U.S. Data Centers Tracker after review. Details to be corroborated from primary sources.
Operator chain
- Ultimate parentEdgeConneX, Inc.
- Files asEdgeConneX, Inc.
- This facilityEdgeConneX potential Data Center
Grid & water — why here
source: HIFLD · EPAThe closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.
In the news
source: Google News- Virginia company has plans for third data center campus in Bastrop CountyThe Business Journals· Jun 10, 2026
- Town halls set for 3 Cedar Creek data centers spanning nearly 1,500 acresCommunity Impact | News· Jun 9, 2026
- EdgeConneX files to build two 730,000 sq ft data centers in Bastrop County, TexasData Center Dynamics· Jun 3, 2026
- $1.4bn EdgeConneX Data Center in Bastrop County, Texas Advances with TDLR Filings SubmittedConstruction Review· Jun 1, 2026
- Tiny Texas town secures Lone Star State's latest $1.4B tech havenMySA· May 31, 2026
- EdgeConneX files plans for $1.4B data center project in Bastrop CountyThe Business Journals· May 29, 2026
Tax breaks & subsidies
source: Good Jobs First / GASB 77No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.
Texas reported $16.1M in Property used in certain large data center projects; temporary exemption (Texas Tax Code § 151.3595) for FY2025 (Texas Comptroller of Public Accounts). Program-wide, not attributable to this site.
Water use
No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Nearest school
source: HIFLD / NCESThe nearest public school, Red Rock El in Red Rock, is 3.3 mi from this site (698 students).
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.