Mapped (unverified)
EdgeConneX data center, Dublin, Ireland
Dublin, Ireland
Source: OpenStreetMap
EdgeConneX data center in Dublin, Ireland is a mapped facility, operated by EdgeConneX, Inc.. DataCentersExposed has documented a 47,172 sq ft footprint at this site. It runs on Ireland's grid, which was 52% fossil-fuelled at 257 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Real parent
EdgeConneX, Inc.
Operator
EdgeConneX, Inc.
Est. capacity
~5-20 MW
Footprint
47,172 sq ft
Grid carbon
257 gCO₂/kWh
Clean electricity
48%
DC power price
22.51¢/kWh
Region
Dublin
Overview
source: linkEdgeConneX data center in Ireland
Operator chain
- Ultimate parentEdgeConneX, Inc.
- Files asEdgeConneX, Inc.
- This facilityEdgeConneX data center
The grid behind this site
source: Ember · EurostatGrid carbon intensity
257 gCO₂/kWh
Clean electricity
48%
Fossil electricity
52%
Data-center power price
22.51¢/kWh
A large data center in Ireland pays 22.51¢/kWh for electricity — a household pays 30.46¢, 26% more than the data center (Eurostat).
Data centres used 21% of Ireland's national electricity in 2023 (CSO Ireland).
National grid context, not this facility's own metering. Full country picture: Ireland data centers.
In the news
source: Google News (local + English)- CoreWeave to lease capacity from EdgeConneX at data center campus in Cedar Creek, TexasData Center Dynamics· Jul 27, 2026
- CPP Investments to pump $1.75 billion into EQT and EdgeConneX's AI data center build-outData Center Dynamics· Jul 3, 2026
- The $176 Billion Detour: How Europe's Data Centers Built Three Regulatory Workarounds When the Grid Said NoSubstack· Jun 16, 2026
- EdgeConneX plans €3bn data center investment in ItalyData Center Dynamics· May 22, 2026
- EdgeConneX affiliate proposes 430MW natural gas plant to power data center campus in New Albany, OhioData Center Dynamics· Apr 14, 2026