EdgeConneX Detroit DET01

Oakland County, MI

Source: OpenStreetMap

EdgeConneX Detroit DET01 is an operating data center in Oakland County, MI, operated by EdgeConneX, Inc.. DataCentersExposed has documented 3 MW of reported power capacity and a 40,574 sq ft footprint at this site.

Reporting by · Updated Jun 18, 2026

Real parent
EdgeConneX, Inc.
Operator
EdgeConneX, Inc.
Power
3 MW
Footprint
40,574 sq ft
Utility
DTE Electric Company
Grid
MISO
Attribution & capacity confidence:mediumprimary source

Overview

source: link

EdgeConneX Detroit DET01 is an operating colocation data center in Oakland County, Michigan, run by EdgeConneX, Inc. Its reported footprint is 40,574 square feet. The site draws power from DTE Electric Company inside the MISO grid.

Operator chain

The grid behind this site, right now

source: MISO · gridstatus
Clean right now
30%
Fossil right now
67%
Grid operator
MISO
  • Natural Gas34.4%
  • Coal32.8%
  • Solar15.4%
  • Nuclear10.2%
  • Wind4.1%
  • Other2.2%
  • Imports0.9%

Real-time generation mix for the MISO grid this site draws from, as of Aug 17, 2026, 8:05 PM. ISO-wide, not this facility's own metering. Source: gridstatus.

Grid & water — why here

source: HIFLD · EPA
Nearest substation
2.2 mi
Redford
Transmission line
0.3 mi
120 kV line
Municipal water
Served
Southfield

The closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.

Tax breaks & subsidies

source: Good Jobs First / GASB 77

No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.

Statewide cost of this incentive

Michigan reported $1.1M in Data Center / Colocation Sales and Use Tax Exemption (MCL 205.54ee / 205.94, pre-2025 program) for FY2023 (Michigan Department of Treasury, Office of Revenue and Tax Analysis (ORTA)). Program-wide, not attributable to this site.

source · All Michigan subsidies →

Water use

No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.

EPA permits & violations

source: EPA ECHO

No reported violations as of last sync.

Air quality near this site

source: AirNow
57
PM2.5
Moderate
49
O3
Good
19
PM10
Good

Air Quality Index from the nearest AirNow reporting area (Detroit), as of 2026-06-10. Regional context — not this facility's own emissions.

Who lives nearby

source: Census ACS 2023
Median household income
$63K
People of color
79%
Below poverty
11%
Tract population
4,006

Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.

Nearest school

source: HIFLD / NCES

The nearest public school, Weston Preparatory Academy in Detroit, is 0.7 mi from this site (248 students). 3 public schools sit within a mile of the site.

Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).

Hearings timeline

No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.

See something wrong or missing on this page? Suggest a correction.