Eagle Rock Christian County Data Center is a proposed data center in Christian County, IL, operated by Eagle Rock Partners. DataCentersExposed has documented 1,000 MW of reported power capacity at this site.
Reporting by Eric Keller · Updated Jun 18, 2026
Overview
source: linkThe Meridian Technology Park is a proposed $6 billion to $8.8 billion data-center campus on 475 acres of farmland in Bear Creek Township, about two miles southwest of Taylorville, Illinois. The developer is Charlotte-based Eagle Rock Partners, and the plan is ten 100-megawatt buildings, a full gigawatt. No hyperscaler tenant has been named, which is itself the point: Eagle Rock is a speculative developer.
The site choice tells the story. It sits on two existing 345-kilovolt transmission lines in the same county as Vistra's 1,319-megawatt Kincaid coal plant, which fully retires at the end of 2027. The data center would absorb the grid capacity and tax base that coal is leaving behind, one megawatt of fossil load swapped for one megawatt of servers on the same wires.
The county held its first formal discussion in June 2026, and a petition for an 18-month moratorium gathered nearly 700 signatures. Eagle Rock says it, not ratepayers, will pay for grid upgrades and that cooling will be closed-loop, and points to Illinois data-center incentives. Residents note the developer is fighting opposition at its Georgia sites too.
Operator chain
- Files asEagle Rock Partners
- This facilityEagle Rock Christian County Data Center
The grid behind this site, right now
source: MISO · gridstatus- Natural Gas34.4%
- Coal32.8%
- Solar15.4%
- Nuclear10.2%
- Wind4.1%
- Other2.2%
- Imports0.9%
Real-time generation mix for the MISO grid this site draws from, as of Aug 17, 2026, 8:05 PM. ISO-wide, not this facility's own metering. Source: gridstatus.
Grid & water — why here
source: HIFLD · EPAThe closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.
In the news
source: GDELT- Data center developer abandons plans for Christian County - Illinois TimesIllinois Times· Aug 12, 2026
- Proposed Christian County Data Center Pursuit Has Ended - FOX IllinoisFOX Illinois· Aug 12, 2026
- Eagle Rock halts plans for data center in Christian Co. - wandtv.comwandtv.com· Aug 12, 2026
- Crowd reacts to Christian County data center plan - Illinois TimesIllinois Times· Jun 24, 2026
- Crowd reacts to Christian County data center plan - springfieldbusinessjournal.comspringfieldbusinessjournal.com· Jun 24, 2026
- Eagle Rock faces community questions over proposed Christian County data center - wandtv.comwandtv.com· Jun 17, 2026
Tax breaks & subsidies
source: Good Jobs First / GASB 77No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.
Illinois reported $983.2M in Data Center Investment Program — state & local sales/use tax exemption (20 ILCS 605/605-1025; administered by DCEO) (2019-2024 (27 certified data centers; cumulative estimated exemption value)) (Illinois Department of Commerce and Economic Opportunity (DCEO)). Program-wide, not attributable to this site.
Water use
No measured record exists, so this is a low-confidence model from 1,000 MW (disclosed IT power): 1.8 L/kWh cooling (temperate climate) + 0.45 gal/kWh embedded in US grid average. How we estimate. Have a utility document? Send it and we'll replace this with the real figure.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Nearest school
source: HIFLD / NCESThe nearest public school, Memorial Elem School in Taylorville, is 3.5 mi from this site (261 students).
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.