Overview
source: linkSFO10 is an operating colocation data center in San Francisco, California, run by Digital Realty Trust, Inc. Public records put its footprint at 104,867 square feet. The site draws power from the City and County of San Francisco inside the CISO balancing authority.
Operator chain
- Ultimate parentDigital Realty Trust, Inc.
- Files asDigital Realty Trust, Inc.
- This facilityDigital Realty San Francisco SFO10
The grid behind this site, right now
source: CAISO · gridstatus- Solar46.8%
- Natural Gas28.7%
- Wind9.2%
- Hydro7.3%
- Nuclear5.3%
- Geothermal1.8%
- Biomass0.9%
Real-time generation mix for the CAISO grid this site draws from, as of Jul 15, 2026, 10:20 PM. ISO-wide, not this facility's own metering. Source: gridstatus.
Grid & water — why here
source: HIFLD · EPAThe closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.
In the news
source: GDELT- Letters: Before putting data centers on California fairgrounds, we need real numbers about them - San Francisco ChronicleSan Francisco Chronicle· Jul 9, 2026
- Historic venue on edge of San Francisco could get a data center - San Francisco ChronicleSan Francisco Chronicle· Jul 8, 2026
- California proposal would build 8 data centers in Bay Area. Here’s where - San Francisco ChronicleSan Francisco Chronicle· Jul 7, 2026
- Calistoga won’t pursue data center at fairgrounds after resident backlash - San Francisco ChronicleSan Francisco Chronicle· Jul 1, 2026
- California’s high-speed rail may be laying the way for a ‘valley of data centers’ - San Francisco ChronicleSan Francisco Chronicle· Jun 18, 2026
- Map of California data centers: See where projects are operating or planned near you - San Francisco ChronicleSan Francisco Chronicle· Apr 23, 2026
Tax breaks & subsidies
source: Good Jobs First / GASB 77No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.
Water use
No measured record exists, so this is a low-confidence model from 37 MW (interconnection capacity): 2 L/kWh cooling (hot climate) + 0.45 gal/kWh embedded in US grid average. How we estimate. Have a utility document? Send it and we'll replace this with the real figure.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Air quality near this site
source: AirNowAir Quality Index from the nearest AirNow reporting area (San Francisco), as of 2026-06-10. Regional context — not this facility's own emissions.
Who lives nearby
source: Census ACS 2023Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.
Nearest school
source: HIFLD / NCESThe nearest public school, Kipp Bayview Academy in San Francisco, is 0.3 mi from this site (199 students). 12 public schools sit within a mile of the site.
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.