Skip to content
DataCentersExposed
Operatingcolocation

360 Spear Street Data Center

360 Spear Street · San Francisco, San Francisco County, CA

Source: OpenStreetMap

360 Spear Street Data Center is an operating data center in San Francisco County, CA, operated by Digital Realty Trust, Inc.. DataCentersExposed has documented a 34,599 sq ft footprint at this site.

Reporting by · Updated Jun 17, 2026

Real parent
Digital Realty Trust, Inc.
Operator
Digital Realty Trust, Inc.
Est. capacity
~5-15 MW
Footprint
34,599 sq ft
Interconnection
~37 MW
Utility
City & County of San Francisco
Grid
CISO
Attribution & capacity confidence:mediumprimary source

Overview

source: link

360 Spear Street is an operating colocation data center in San Francisco, California, run by Digital Realty Trust, Inc. Its reported footprint is 34,599 square feet. The site draws power from the City and County of San Francisco utility inside the CISO balancing authority.

Operator chain

The grid behind this site, right now

source: CAISO · gridstatus
Clean right now
71%
Fossil right now
29%
Grid operator
CAISO
  • Solar46.8%
  • Natural Gas28.7%
  • Wind9.2%
  • Hydro7.3%
  • Nuclear5.3%
  • Geothermal1.8%
  • Biomass0.9%

Real-time generation mix for the CAISO grid this site draws from, as of Jul 15, 2026, 10:20 PM. ISO-wide, not this facility's own metering. Source: gridstatus.

Grid & water — why here

source: HIFLD · EPA
Nearest substation
0.2 mi
Embarcadero · 230 kV
Transmission line
289 ft
230 kV line
Municipal water
Served
Sfpuc City Distribution Division

The closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.

Tax breaks & subsidies

source: Good Jobs First / GASB 77

No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.

Water use

Modeled estimate~695K gpd
Direct (onsite cooling)
~375.3K gpd
Indirect (its electricity)
~319.7K gpd

No measured record exists, so this is a low-confidence model from 37 MW (interconnection capacity): 2 L/kWh cooling (hot climate) + 0.45 gal/kWh embedded in US grid average. How we estimate. Have a utility document? Send it and we'll replace this with the real figure.

EPA permits & violations

source: EPA ECHO

No reported violations as of last sync.

Air quality near this site

source: AirNow
57
PM2.5
Moderate
19
O3
Good

Air Quality Index from the nearest AirNow reporting area (San Francisco), as of 2026-06-10. Regional context — not this facility's own emissions.

Who lives nearby

source: Census ACS 2023
Median household income
$250K
People of color
75%
Below poverty
1%
Tract population
1,162

Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.

Nearest school

source: HIFLD / NCES

The nearest public school, Lee (edwin And Anita) Newcomer in San Francisco, is 0.9 mi from this site (21 students). 2 public schools sit within a mile of the site.

Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).

Hearings timeline

No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.