Mapped (unverified)colocation
Datum data center, Farnborough
Farnborough, Hampshire, United Kingdom
Source: Primary source
Datum data center in Hampshire, United Kingdom is a mapped facility, operated by Datum. It runs on United Kingdom's grid, which was 36% fossil-fuelled at 217 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 18, 2026
Real parent
Datum
Operator
Datum
Grid carbon
217 gCO₂/kWh
Clean electricity
64%
Region
Hampshire
Overview
source: linkDatum Datacentres Limited — colocation facility (12 networks present). Source: PeeringDB.
Operator chain
The grid behind this site
source: Ember · EurostatGrid carbon intensity
217 gCO₂/kWh
Clean electricity
64%
Fossil electricity
36%
National grid context, not this facility's own metering. Full country picture: United Kingdom data centers.
In the news
source: Google News (local + English)- Police seize £1.2m worth of equipment during raid of data center in Farnborough, UK - DCDData Center Dynamics· Jun 1, 2026
- UK police puts out call for £120m VHS tape archive digitization pitchesData Center Dynamics· Jul 10, 2025
- UK operator Datum launches second Manchester data centerData Center Dynamics· Jul 2, 2025
- Strong start to the year for Farnborough’s Datum Data CentresInsider Media Ltd· Aug 8, 2024
- Datum completes 1MW data hall expansion in FarnboroughData Center Dynamics· Jul 20, 2023
- Datum to open two new data centresbusinesscloud.co.uk· Feb 6, 2023
See something wrong or missing on this page? Suggest a correction.