Mapped (unverified)colocation
Datum data center, Farnborough
Farnborough, Hampshire, United Kingdom
Source: Primary source
Datum data center in Hampshire, United Kingdom is a mapped facility, operated by Datum. It runs on United Kingdom's grid, which was 36% fossil-fuelled at 217 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Oct 13, 2026
Real parent
Datum
Operator
Datum
Grid carbon
217 gCO₂/kWh
Clean electricity
64%
Region
Hampshire
Overview
source: linkDatum Datacentres Limited — colocation facility (12 networks present). Source: PeeringDB.
Operator chain
The grid behind this site
source: Ember · EurostatGrid carbon intensity
217 gCO₂/kWh
Clean electricity
64%
Fossil electricity
36%
National grid context, not this facility's own metering. Full country picture: United Kingdom data centers.
In the news
source: Google News (local + English)- Major data centre development gathers pace in HampshireBasingstoke Gazette· Sep 27, 2026
- Dozens of students get a glimpse behind the scenes of the digital worldBasingstoke Gazette· Aug 2, 2026
- AI Summer School Students Visit Datum’s Farnborough Data Centre to Explore Infrastructure Behind Digital Technologies – TECHNOLOGY RESELLERTECHNOLOGY RESELLER· Jul 31, 2026
- Farnborough Students Gain Data Centre Experience Through Placements and Site VisitsTECHNOLOGY RESELLER· Jul 1, 2026
- Police seize £1.2m worth of equipment during raid of data center in Farnborough, UKData Center Dynamics· Jun 1, 2026
- Datum completes 1MW data hall expansion in FarnboroughData Center Dynamics· Jul 20, 2023
See something wrong or missing on this page? Suggest a correction.