Mapped (unverified)
Datum Datacentres (MCR2)
United Kingdom
Source: OpenStreetMap
Datum Datacentres (MCR2) is a mapped data center in United Kingdom. DataCentersExposed has documented a 24,156 sq ft footprint at this site. It runs on United Kingdom's grid, which was 36% fossil-fuelled at 217 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Real parent
—
Operator
—
Est. capacity
~5-10 MW
Footprint
24,156 sq ft
Grid carbon
217 gCO₂/kWh
Clean electricity
64%
Region
United Kingdom
Status · click to filter
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkdata center
The grid behind this site
source: Ember · EurostatGrid carbon intensity
217 gCO₂/kWh
Clean electricity
64%
Fossil electricity
36%
National grid context, not this facility's own metering. Full country picture: United Kingdom data centers.
In the news
source: Google News (local + English)- Mike Kane MP Visits Datum Datacentres’ new Manchester Data CentreInvest in Manchester· Jul 29, 2025
- Heat re-use technology to be incorporated in new Manchester data centreSolar Power Portal· Jul 23, 2025
- UK operator Datum launches second Manchester data centre in WythenshaweGreater Manchester Business Board· Jul 2, 2025
- UK operator Datum launches second Manchester data centerData Center Dynamics· Jul 2, 2025
- New Manchester data centre appoints Principle Networks as connectivity partnerInsider Media Ltd· Feb 10, 2025
- Datum to open two new data centresbusinesscloud.co.uk· Feb 6, 2023