Mapped (unverified)
datacenter Lübbenau
Brandenburg, Germany
Source: Wikidata
datacenter Lübbenau is a mapped data center in Brandenburg, Germany, operated by Schwarz Digits. It runs on Germany's grid, which was 41% fossil-fuelled at 330 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Real parent
Schwarz Digits
Operator
Schwarz Digits
Grid carbon
330 gCO₂/kWh
Clean electricity
59%
DC power price
21.56¢/kWh
Region
Brandenburg
Overview
source: linkLübbenau is a mapped data center in Germany, operated by Schwarz Digits. Available records do not disclose an ultimate parent above Schwarz Digits, and no capacity, footprint, or environmental figures are listed for the site.
Operator chain
- Ultimate parentSchwarz Digits
- Files asSchwarz Digits
- This facilitydatacenter Lübbenau
The grid behind this site
source: Ember · EurostatGrid carbon intensity
330 gCO₂/kWh
Clean electricity
59%
Fossil electricity
41%
Data-center power price
21.56¢/kWh
A large data center in Germany pays 21.56¢/kWh for electricity — a household pays 39.43¢, 45% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Germany data centers.
In the news
source: Google News (local + English)- Neue Steuerregel für Rechenzentren geplantNIEDERLAUSITZ aktuell· Aug 29, 2026
- Vom Discounter zur Datenmacht: Schwarz-Gruppe baut ihr Cloud-Imperium für 12 Milliarden ausBusiness Punk· Aug 28, 2026
- Lidl-Konzern plant gigantisches KI-Rechenzentrum in MecklenburgWinFuture· Aug 28, 2026
- Schwarz Digits: Deutscher Cloudanbieter steht vor großen HerausforderungenDr. Windows· Aug 27, 2026
- Milliarden Euro für die digitale Zukunft: Schwarz Gruppe baut eines der größten Rechenzentren DeutschlandsSWR· Aug 27, 2026
- Schwarz-Gruppe baut großes Rechenzentrum bei RostockZDFheute· Aug 27, 2026
See something wrong or missing on this page? Suggest a correction.