Mapped (unverified)
datacenter Lübbenau
Brandenburg, Germany
Source: Wikidata
datacenter Lübbenau is a mapped data center in Brandenburg, Germany, operated by Schwarz Digits. It runs on Germany's grid, which was 41% fossil-fuelled at 330 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Real parent
Schwarz Digits
Operator
Schwarz Digits
Grid carbon
330 gCO₂/kWh
Clean electricity
59%
DC power price
21.56¢/kWh
Region
Brandenburg
Overview
source: linkLübbenau is a mapped data center in Germany, operated by Schwarz Digits. Available records do not disclose an ultimate parent above Schwarz Digits, and no capacity, footprint, or environmental figures are listed for the site.
Operator chain
- Ultimate parentSchwarz Digits
- Files asSchwarz Digits
- This facilitydatacenter Lübbenau
The grid behind this site
source: Ember · EurostatGrid carbon intensity
330 gCO₂/kWh
Clean electricity
59%
Fossil electricity
41%
Data-center power price
21.56¢/kWh
A large data center in Germany pays 21.56¢/kWh for electricity — a household pays 39.43¢, 45% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Germany data centers.
In the news
source: Google News (local + English)- Lidl investiert Milliarden in KI-RechenzentrumFOCUS online· Sep 26, 2026
- Cloud der Schwarz-Gruppe: Stackit lässt es krachenLebensmittel Zeitung· Sep 24, 2026
- Rechenzentren: Wolken über der CloudLebensmittel Zeitung· Sep 21, 2026
- Lidl wird Tech-Konzern: 11 Milliarden Euro, 100.000 KI-Chips und ein riskanter UmbauIndustriemagazin· Sep 14, 2026
- Schwarz-Gruppe baut Rechenzentrum bei Rostocktop agrar· Aug 31, 2026
- Enge Anbindung an Windenergie: Schwarz Digits plant nächstes KI-Rechenzentrum in Mecklenburg-VorpommernHardwareluxx· Aug 28, 2026
See something wrong or missing on this page? Suggest a correction.