Germany · Land
Brandenburg
DataCentersExposed tracks 6 AI data centers in Brandenburg, Germany — 0 operating and 0 in the pipeline — drawing 0 MW of reported power demand from 3 tracked operators.
Sources: Germany, Methodology
Tracked
6
Operating
0
In pipeline
0
Reported power
0 MW
Facilities
Tracked data centers
- Ber11Vantage Data Centers Holdings, LLCMapped (unverified)
- Mapped (unverified)
- Mapped (unverified)
- Vantage Berlin II (BER2)Vantage Data Centers Holdings, LLCMapped (unverified)
- datacenter LübbenauSchwarz DigitsMapped (unverified)
- nLighten Berlin BER1nLightenMapped (unverified)
In the local press
Brandenburg data-center coverage
- Milliarden Euro für die digitale Zukunft: Schwarz Gruppe baut eines der größten Rechenzentren DeutschlandsSWR· Aug 27, 2026
- Schwarz-Gruppe baut großes Rechenzentrum bei RostockZDFheute· Aug 27, 2026
- Digitale Infrastruktur: Schwarz-Gruppe baut milliardenschweres RechenzentrumWiWo· Aug 27, 2026
- Schwarz Digits baut großes KI-Rechenzentrum in Mecklenburg-Vorpommernheise online· Aug 27, 2026
- Berlin / Brandenburg: Rechenzentrum für 5,6 Milliarden Euro bei Rostock geplantTagesspiegel· Aug 27, 2026
- Was von einem Rechenzentrum bleibtMärkische Allgemeine Zeitung· Aug 25, 2026
Live headlines via Google News — in English and Germany's local press.