Datacenter IBM
Auvergne-Rhône-Alpes, France
Source: OpenStreetMap
Datacenter IBM is a mapped data center in Auvergne-Rhône-Alpes, France, operated by IBM. DataCentersExposed has documented a 19,020 sq ft footprint and 2 environmental-permit records at this site. It runs on France's grid, which was 5% fossil-fuelled at 41 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Overview
source: linkDatacenter IBM is a mapped data center in France, operated by IBM. Available records put its footprint at 19,020 square feet. Beyond IBM's role and the site's status as an IBM data center, further details on the facility are not disclosed in available records.
Operator chain
The grid behind this site
source: Ember · EurostatA large data center in France pays 12.24¢/kWh for electricity — a household pays 29.26¢, 58% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: France data centers.
In the news
source: Google News (local + English)- IBM in spotlight as Truist starts with Hold ratingTradingView· Oct 9, 2026
- Après Rantigny, PKM Logistique envisage un datacenter sur la ZAC de Lachelle dans le CompiégnoisOise Hebdo· Aug 18, 2026
- Les 25 meilleures entreprises du marché des services gérés par Data CenterSpherical Insights· Jul 18, 2026
- APL Data Center change d’échelle avec un chiffre d’affaires en hausse de 84%ChannelNews· May 28, 2026
- Top 10 des entreprises de centres de données dans le mondeFortune Business Insights· May 19, 2026
- Une start-up française annonce un ordinateur quantique intégrable dans un data center pour 2033 !Sciencepost· Apr 27, 2026
Environmental permits
source: Géorisques (ICPE)- Onyx Auvergne Rhone-Alpes0005601544ICPE Enregistrement · Gerzat 63360 · registered as "Onyx Auvergne Rhone-Alpes" · ~166 m from the mapped location
- Onyx Auvergne Rhone-Alpes0005601544ICPE Enregistrement · Gerzat 63360 · registered as "Onyx Auvergne Rhone-Alpes" · ~136 m from the mapped location