Skip to content
DataCentersExposed
Mapped (unverified)

Datacenter ArteOne

Nouvelle-Aquitaine, France

Source: OpenStreetMap

Datacenter ArteOne is a mapped data center in Nouvelle-Aquitaine, France, operated by Artefact. It runs on France's grid, which was 5% fossil-fuelled at 41 gCO₂e/kWh in 2025 (Ember).

Reporting by · Updated Jun 14, 2026

Real parent
Artefact
Operator
Artefact
Grid carbon
41 gCO₂/kWh
Clean electricity
95%
DC power price
12.24¢/kWh
Region
Nouvelle-Aquitaine
Attribution & capacity confidence:mediumprimary source
Status · click to filter

Most sites are mapped — located but awaiting a second source. How we verify

Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.

Overview

source: link

Datacenter ArteOne is a mapped data center in France, operated by Artefact. Available records identify it as an Artefact data center but disclose no capacity, footprint, or ultimate parent. Further details on ownership and operations are not present in the public record.

Operator chain

The grid behind this site

source: Ember · Eurostat
Grid carbon intensity
41 gCO₂/kWh
Clean electricity
95%
Fossil electricity
5%
Data-center power price
12.24¢/kWh

A large data center in France pays 12.24¢/kWh for electricity — a household pays 29.26¢, 58% more than the data center (Eurostat).

National grid context, not this facility's own metering. Full country picture: France data centers.

Methodology & sources

Every row carries a confidence level (high / medium / low) and a source URL. Spot an error? Tell us.