DataBank Plano Data Center
8375 Dominion Parkway · Plano, Collin County, TX
Source: OpenStreetMap
DataBank Plano Data Center is an operating data center in Collin County, TX, operated by Prime Data Centers. DataCentersExposed has documented 20 MW of reported power capacity and a 375,691 sq ft footprint at this site.
Reporting by Eric Keller · Updated Jun 18, 2026
Overview
source: linkdata center
Operator chain
- Ultimate parentPrime Data Centers
- Files asPrime Data Centers
- This facilityDataBank Plano Data Center
Grid & water — why here
source: HIFLD · EPAThe closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.
In the news
source: Google News- Aligned Data Centers plots suburban complex after Phoenix restrictionsThe Real Deal· May 29, 2026
- Seattle Considers 365-Day Data Center MoratoriumBroadband Breakfast· May 1, 2026
- Portugal Approves National Data Centre PlanThe Portugal News· Apr 15, 2026
- Who’s Funding the Data Center Boom?CommercialSearch· Mar 4, 2026
- New D-FW Data Centers Pump Up Construction SpendingCandysDirt.com· Jan 8, 2026
- Lambda to deploy GPU cluster at Prime's LAX01 data center in CaliforniaData Center Dynamics· Nov 17, 2025
Tax breaks & subsidies
source: Good Jobs First / GASB 77No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.
Texas reported $16.1M in Property used in certain large data center projects; temporary exemption (Texas Tax Code § 151.3595) for FY2025 (Texas Comptroller of Public Accounts). Program-wide, not attributable to this site.
Water use
No measured record exists, so this is a low-confidence model from 175 MW (interconnection capacity): 2 L/kWh cooling (hot climate) + 0.45 gal/kWh embedded in US grid average. How we estimate. Have a utility document? Send it and we'll replace this with the real figure.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Environmental permits
source: Permit registerAir quality near this site
source: AirNowAir Quality Index from the nearest AirNow reporting area (Dallas-Fort Worth), as of 2026-06-10. Regional context — not this facility's own emissions.
Who lives nearby
source: Census ACS 2023Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.
Nearest school
source: HIFLD / NCESThe nearest public school, Lone Star Language Academy in Plano, is 1.3 mi from this site (174 students).
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.