Collin County, Texas

DataCentersExposed tracks 12 AI data centers in Collin County, Texas — 5 operating and 0 in the pipeline, drawing 42 MW of reported power demand, led by Flexential Corp.. Its transparent data-center risk score is 0/100.

Sources: Methodology, Coverage scorecard

Facilities
12
Operating
5
Pipeline
0

Reporting by · Updated May 29, 2026

Risk breakdown
13Low
  • Project exposure · 23
  • Power demand · 0
  • Water draw · n/a
  • Land footprint · n/a
Overview

What's happening in Collin County

Facilities here with disclosed capacity draw 42 MW from the local grid. Data-center load on this scale is the single biggest driver of recent capacity-market price increases — costs that flow through to every ratepayer in the service territory, not just the operators.

Flexential Corp. has the largest presence in Collin County. We resolve project codenames and shell LLCs back to the corporate parent wherever the public record allows, so the table below names who is actually behind each site.

Below: every tracked facility in the county, the active state legislation that names it or its county, and local news. Commissioner vote records arrive in a later release; the placeholders show where that accountability data will land.

Modeled scenario · not announced

2035 Buildout Outlook

via PNNL IM3 (CC BY 4.0)

Under the model's moderate-growth scenario (5%/yr annual load growth), PNNL's IM3 model sites about 7 standardized 36 MW campuses in Collin County by 2035 — roughly 252 MW of new electricity demand and ~244 M gal/yr of cooling water. For scale, we currently track 12 real data centers in Collin County (42 MW of reported power).

Modeled new campuses by demand-growth scenario
  • Higher growth7
    252 MW · ~244 M gal/yr cooling water

The model assigns ~100% of these campuses' cooling to evaporative water cooling in Collin County (the rest to mechanical/air cooling), a split it derives from local water stress and wet-bulb temperature.

These are modeled candidate sites, not announced or permitted facilities. PNNL's IM3 model places identical 36 MW unit-campuses at feasible locations under each scenario — it shows where demand could concentrate, never a specific parcel. Figures use a market-gravity weight of 50. How the model works.

12 facilities

Every tracked facility

FacilityOperatorStatusMW
DataBank Plano Data Center
Plano
Prime Data CentersOperating20
Flexential Dallas - Plano
Plano
Flexential Corp.Operating18
Flexential Dallas - Richardson
Richardson
Flexential Corp.Mapped (unverified)3.75
Aligned Data Centers
Plano
Prime Data CentersMapped (unverified)
Cisco AllenMapped (unverified)
CyrusOne AllenCyrusOne LLCMapped (unverified)
DFW-04 Data Center
Plano
Operating
Experian Data Center Allen
Allen
Operating
Evoque Allen DA1
Allen
Mapped (unverified)
Experian McKinney Data CenterMapped (unverified)
Stream DFW IVStream Data CentersMapped (unverified)
Tierpoint Dallas-AllenTierPoint, LLCOperating
Accountability

County commissioners

How the Collin County board votes on each data-center matter — the rezonings, the abatements, the water permits — is built from public-meeting minutes and roll-call records. Know of a vote we should be tracking? Tell us.

Methodology & sources

The risk score weights project exposure (40%), power demand (30%), water draw (15%), and land footprint (15%). Water and land are not yet measured for our facilities, so those arcs render as "not yet measured" and the weights are renormalized over the factors we can source today — when the data lands, the score updates.

Every row carries a confidence level (high / medium / low) and a source URL. Spot an error? Tell us.