Data Vault - Bournemouth BCP01
Bournemouth, Bournemouth, Christchurch and Poole, United Kingdom
Source: OpenStreetMap
Data Vault - Bournemouth BCP01 is a mapped data center in Bournemouth, Christchurch and Poole, United Kingdom, operated by Dark Nebulae Ltd. It runs on United Kingdom's grid, which was 36% fossil-fuelled at 217 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkData Vault - Bournemouth BCP01 is a mapped data center in Bournemouth, United Kingdom, operated by Dark Nebulae Ltd. Available records identify it only as a Dark Nebulae Ltd data center, with no ultimate parent disclosed. Power capacity, footprint, and any environmental enforcement records are not listed in available filings.
Operator chain
- Ultimate parentDark Nebulae Ltd
- Files asDark Nebulae Ltd
- This facilityData Vault - Bournemouth BCP01
The grid behind this site
source: Ember · EurostatNational grid context, not this facility's own metering. Full country picture: United Kingdom data centers.
In the news
source: Google News (local + English)No recent coverage found for this facility.