Mapped (unverified)colocation
Bournemouth Data Centre
Bournemouth, Bournemouth, Christchurch and Poole, United Kingdom
Source: Primary source
Bournemouth Data Centre is a mapped data center in Bournemouth, Christchurch and Poole, United Kingdom. It runs on United Kingdom's grid, which was 36% fossil-fuelled at 217 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
217 gCO₂/kWh
Clean electricity
64%
Region
Bournemouth, Christchurch and Poole
Status · click to filter
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkMAINFRAME & CYBERNETIC SYSTEMS LIMITED — colocation facility (4 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
217 gCO₂/kWh
Clean electricity
64%
Fossil electricity
36%
National grid context, not this facility's own metering. Full country picture: United Kingdom data centers.
In the news
source: Google News (local + English)- NetNerd (Formerly Free Virtual Servers) Review 2026 – Is It Worth It?Website Planet· Feb 9, 2026
- Shares suspended in IT firm – but bosses say it's being turned aroundBournemouth Echo· Jul 4, 2019
- Bournemouth's bright blue drawing studio is Peter Cook's first building in the UKDezeen· Mar 4, 2016
- UPDATED: C4L sold for £20mBournemouth Echo· Feb 18, 2016
- Kortext, Universal Bipolar to drive digital books in NigeriaThe Guardian Nigeria News· Jan 20, 2015
See something wrong or missing on this page? Suggest a correction.