CyrusOne Quincy

Grant County, WA

Source: OpenStreetMap

CyrusOne Quincy is a mapped data center in Grant County, WA, operated by CyrusOne LLC. DataCentersExposed has documented a 119,147 sq ft footprint at this site.

Reporting by · Updated Jun 14, 2026

Real parent
CyrusOne LLC
Operator
CyrusOne LLC
Est. capacity
~20-50 MW
Footprint
119,147 sq ft
Interconnection
~37 MW
Utility
PUD No 2 of Grant County
Grid
GCPD
Attribution & capacity confidence:mediumprimary source
Status · click to filter

Most sites are mapped — located but awaiting a second source. How we verify

Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.

Overview

source: link

CyrusOne Quincy is a mapped colocation data center in Grant County, Washington, operated by CyrusOne LLC. Records put its footprint at 119,147 square feet. The site draws power from PUD No 2 of Grant County inside the GCPD balancing authority.

Operator chain

Tax breaks & subsidies

source: Good Jobs First / GASB 77

These tax breaks are recorded to CyrusOne LLC (the operator/parent) and may cover this or other sites — no state names the recipient at the facility level.

Dollar value not disclosed for these records.
  • Texas Qualifying Large Data Center Project Exemption$0
    State of Texas · granted 2022 · term yr · source
  • Texas Qualifying Data Center Exemption$0
    State of Texas · granted 2017 · term yr · source
  • Texas Qualifying Data Center Exemption$0
    State of Texas · granted 2016 · term yr · source
Statewide cost of this incentive

Washington reported $100.1M in Data center equipment and infrastructure sales/use tax exemption — rural counties (RCW 82.08.986 / 82.12.986) for FY2024 (Washington State Department of Revenue). Program-wide, not attributable to this site.

source · All Washington subsidies →

Water use

Modeled estimate~544.9K gpd
Direct (onsite cooling)
~225.2K gpd
Indirect (its electricity)
~319.7K gpd

No measured record exists, so this is a low-confidence model from 37 MW (interconnection capacity): 1.2 L/kWh cooling (cool climate) + 0.45 gal/kWh embedded in US grid average. How we estimate. Have a utility document? Send it and we'll replace this with the real figure.

EPA permits & violations

source: EPA ECHO

No reported violations as of last sync.

Air quality near this site

source: AirNow
2
PM2.5
Good

Air Quality Index from the nearest AirNow reporting area (Quincy), as of 2026-06-10. Regional context — not this facility's own emissions.

Who lives nearby

source: Census ACS 2023
Median household income
$82.6K
People of color
81%
Below poverty
13%
Tract population
7,949

Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.

Nearest school

source: HIFLD / NCES

The nearest public school, Mountain View Elementary in Quincy, is 0.6 mi from this site (279 students). 3 public schools sit within a mile of the site.

Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).

Hearings timeline

No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.