Crusoe Warrenton Data Center (Meta)

22151 NW Service Road · Warrenton, Warren County, MO

Source: Primary source

Crusoe Warrenton Data Center (Meta) is a proposed data center in Warren County, MO, operated by Crusoe. DataCentersExposed has documented a 1,650,000 sq ft footprint at this site.

Reporting by · Updated Jun 21, 2026

Real parent
Crusoe
Operator
Crusoe
Est. capacity
~330-675 MW
Footprint
1,650,000 sq ft
Grid
MISO
Attribution & capacity confidence:mediumprimary source

Overview

source: link

Crusoe is developing a data center campus at 22151 NW Service Road in Warrenton, in Warren County, Missouri, the second of two sites under a roughly 1.6 GW capacity agreement it signed with Meta in June 2026. The site plan covers about 340 acres and calls for two compute buildings of roughly 805,000 square feet each plus a 40,000 square foot administration building. Crusoe builds, owns, and operates the campus; Meta is the offtaker. The 1.6 GW total is shared with Crusoe's companion campus in Childress, Texas, and the per-site capacity has not been broken out. Crusoe's builds typically lean on on-site or contracted natural gas generation, the key local angle on emissions, water, and grid load. The pin is approximate to the service-road parcel along Interstate 70.

Operator chain

  • Ultimate parent
    Crusoe
  • Files as
    Crusoe
  • This facility
    Crusoe Warrenton Data Center (Meta)
Known aliases: Crusoe Warrenton · Meta Crusoe Warrenton

The grid behind this site, right now

source: MISO · gridstatus
Clean right now
24%
Fossil right now
62%
Grid operator
MISO
  • Natural Gas34.1%
  • Coal28.2%
  • Solar13.2%
  • Imports10.6%
  • Nuclear9.5%
  • Other3.0%
  • Wind1.4%

Real-time generation mix for the MISO grid this site draws from, as of Jul 15, 2026, 8:25 PM. ISO-wide, not this facility's own metering. Source: gridstatus.

Grid & water — why here

source: HIFLD · EPA
Nearest substation
1.2 mi
Unknown162411
Transmission line
5.2 mi
161 kV line
Municipal water
Served
St Charles County Pwsd 2 Warren

The closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.

In the news

source: GDELT

Tax breaks & subsidies

source: Good Jobs First / GASB 77

No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.

Water use

No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.

EPA permits & violations

source: EPA ECHO

No reported violations as of last sync.

Nearest school

source: HIFLD / NCES

The nearest public school, Rebecca Boone Elem. in Warrenton, is 0.7 mi from this site (448 students). 3 public schools sit within a mile of the site.

Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).

Hearings timeline

No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.

See something wrong or missing on this page? Suggest a correction.