COPT Innovation Park Data Center

11120 Thomasson Barn Road · Manassas, Prince William County, VA

Source: OpenStreetMap

COPT Innovation Park Data Center is a mapped data center in Prince William County, VA, operated by Amazon Data Services, Inc. and ultimately owned by Amazon.com, Inc.. DataCentersExposed has documented a 149,206 sq ft footprint at this site.

Reporting by · Updated Jul 15, 2026

Real parent
Amazon.com, Inc.
Operator
Amazon Data Services, Inc.
Est. capacity
~25-60 MW
Footprint
149,206 sq ft
Interconnection
~175 MW
Water
52.2K gpd
Utility
Northern Virginia Elec Coop
Grid
PJM
Attribution & capacity confidence:mediumprimary source

Overview

source: link

Amazon Web Services data center

Operator chain

Grid & water — why here

source: HIFLD · EPA
Nearest substation
1.1 mi
Unknown175912 · 115 kV
Transmission line
1.1 mi
230 kV line
Municipal water
Served
Pwcsa - West

The closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.

Tax breaks & subsidies

source: Good Jobs First / GASB 77

No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.

Statewide cost of this incentive

Virginia reported $1B in Data Center Retail Sales and Use Tax Exemption (Va. Code § 58.1-609.3(18)) for FY2024 (Virginia Joint Legislative Audit and Review Commission (JLARC) / Weldon Cooper Center). Program-wide, not attributable to this site.

source · All Virginia subsidies →

Water use

  • Reported withdrawal52.2K gpd
    2024 · groundwater · reported as “Power Loft @ Innovation Data Center” · source

EPA permits & violations

source: EPA ECHO

No reported violations as of last sync.

What this site costs the grid

source: PJM RPM auction reports
Dominion (Virginia / NC) · 2027/28 auction
$333 /MW-day
Peaked at $444/MW-day in 2025/26 1.65× the rest of PJM

PJM's capacity auction sets a $/MW-day price that utilities pass on to every household and business in the zone. This site sits in PJM's DOM pricing zone, where soaring data-center demand is a documented driver. See the full zone-by-zone breakdown →

This site's capacity-market cost (estimated)
$3M to $7.3M/yr

An estimated ~25 to 60 MW of load at the zone's $333/MW-day, annualized — the capacity charge a load this size carries at the current auction price. Estimated from the building footprint at 200 to 400 W/ft² (the typical range for modern data centers). A rough order-of-magnitude figure, not a metered or permitted capacity.

Separately, a typical home in this zone pays an estimated $4 to $10/mo more on the capacity portion of its bill that PJM's market monitor attributes to data-center demand. See your address's full impact →

Nearest school

source: HIFLD / NCES

The nearest public school, Victory Elementary in Bristow, is 1.4 mi from this site (694 students).

Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).

Hearings timeline

No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.