Mapped (unverified)colocation
Bytemark YO26 DC1
York, York, United Kingdom
Source: Primary source
Bytemark YO26 DC1 is a mapped data center in York, United Kingdom. It runs on United Kingdom's grid, which was 36% fossil-fuelled at 217 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
217 gCO₂/kWh
Clean electricity
64%
Region
York
Overview
source: linkBytemark Limited — colocation facility (3 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
217 gCO₂/kWh
Clean electricity
64%
Fossil electricity
36%
National grid context, not this facility's own metering. Full country picture: United Kingdom data centers.
In the news
source: Google News (local + English)- North Yorkshire’s hopes for £85bn boost dashed as officials confirm ‘AI Growth Zone’ bid rejectedYorkshire Post· Oct 9, 2026
- Drax’s ‘sustainable’ data centre fails to secure government backingThe Times· Oct 6, 2026
- Campaigners ‘won’t stop’ until moratorium announced on AI data centresThe York Press· Sep 3, 2026
- Proposed London datacentre ‘incompatible’ with net zero with 1m-tonne carbon footprintThe Guardian· Aug 21, 2026
- Plans filed for 180MW data center development in South East London, UKData Center Dynamics· Aug 19, 2026
- Top 10: Data Centre Companies in the UKData Centre Magazine· Aug 19, 2026
See something wrong or missing on this page? Suggest a correction.