Mapped (unverified)colocation
atNorth SWE01
Stockholm, Stockholms län, Sweden
Source: Primary source
atNorth SWE01 is a mapped data center in Stockholms län, Sweden. It runs on Sweden's grid, which was 1% fossil-fuelled at 35 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
35 gCO₂/kWh
Clean electricity
99%
DC power price
7.47¢/kWh
Region
Stockholms län
Overview
source: linkatNorth — colocation facility (3 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
35 gCO₂/kWh
Clean electricity
99%
Fossil electricity
1%
Data-center power price
7.47¢/kWh
A large data center in Sweden pays 7.47¢/kWh for electricity — a household pays 23.51¢, 68% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Sweden data centers.
In the news
source: Google News (local + English)- Stendörren satsar på datacenter – får bygglovFastighetsvärlden· Aug 25, 2026
- Datahallar levererar värme till StockholmTidningen Energi· Aug 18, 2026
- Stockholm tappar fart i datacenterboomenDagens industri· Aug 14, 2026
- DEBATT: Låt inte Google ta Sveriges elExpressen· Aug 7, 2026
- Microsoft satsar 33,7 Mdr på 20 000 GPU:er i Sverige [2026]tech-insider.org· Aug 7, 2026
- Fel i italienskt datacenter bakom taxistörningarnaOmni – Alla nyheter. Alla perspektiv.· Jul 14, 2026
See something wrong or missing on this page? Suggest a correction.