Mapped (unverified)colocation
Bahnhof Thule
Stockholm, Stockholms län, Sweden
Source: Primary source
Bahnhof Thule is a mapped data center in Stockholms län, Sweden, operated by Bahnhof. It runs on Sweden's grid, which was 1% fossil-fuelled at 35 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
Bahnhof
Operator
Bahnhof
Grid carbon
35 gCO₂/kWh
Clean electricity
99%
DC power price
7.47¢/kWh
Region
Stockholms län
Overview
source: linkBahnhof — colocation facility (1 networks present). Source: PeeringDB.
Operator chain
The grid behind this site
source: Ember · EurostatGrid carbon intensity
35 gCO₂/kWh
Clean electricity
99%
Fossil electricity
1%
Data-center power price
7.47¢/kWh
A large data center in Sweden pays 7.47¢/kWh for electricity — a household pays 23.51¢, 68% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Sweden data centers.
In the news
source: Google News (local + English)- Bahnhofs rörelseresultat rasar efter nedskrivning – oförändrad utdelningPlacera.se· Feb 17, 2026
- Stor attack mot Flashback – Banhofs vd: "Ovanligt stor"Nyheter24· Feb 15, 2026
- Bahnhof gräver ner sig – satsar 250 miljoner på AI-bunkerRealtid· Oct 3, 2025
- Bahnhof bygger en supersäker datahall – i SKF:s bunker från kalla krigetNy Teknik· Oct 3, 2025
- Bahnhofs nya satsning: Bygger ”databunker” i GöteborgNy Teknik· Sep 24, 2025
- Corem tecknar 10-årigt avtal med Bahnhof om 1 565 kvm i Kista, Stockholm NorraCorem Property Group· Sep 26, 2023
See something wrong or missing on this page? Suggest a correction.