Mapped (unverified)colocation
ARO DC2 Kilby House (AIMES)
Liverpool, United Kingdom
Source: Primary source
ARO DC2 Kilby House (AIMES) is a mapped data center in United Kingdom. It runs on United Kingdom's grid, which was 36% fossil-fuelled at 217 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
217 gCO₂/kWh
Clean electricity
64%
Region
United Kingdom
Overview
source: linkAIMES — colocation facility (3 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
217 gCO₂/kWh
Clean electricity
64%
Fossil electricity
36%
National grid context, not this facility's own metering. Full country picture: United Kingdom data centers.
In the news
source: Google News (local + English)- UK’s Harworth Group in talks with multiple parties about selling land for data center developmentData Center Dynamics· Aug 5, 2026
- Controversial Brick Lane data centre and office plans approvedBBC· Jul 31, 2026
- British data centre owner set for £14bn US takeoverAOL.com· Jul 22, 2026
- AVK opens Haydock plant for AI data centre systemsDataCentreNews UK· Jul 8, 2026
- Inside AVK's UK Manufacturing Hub for AI InfrastructureData Centre Magazine· Jul 7, 2026
- Investment of £3M Brings AI Infrastructure Manufacturing to the LiverpoolTecherati· Jul 7, 2026
See something wrong or missing on this page? Suggest a correction.